Hi Folks ,
In case we have tunnel service enabled on 2 FPC's , ( MPC3E and MPC 3D 16x10GE )
- is there some logic for selecting an FPC to create the gr- tunnel interface ?
- In the lab we have seen if we disable the gr- interface the tunnel state is Interface DOWN and stays DOWN but when we deactivate / activate the dynamic tunnel-database configuration the tunnel interface moves to next FPC with tunnel services configured ? shouldnt the failover be automatic without need to deacitvate the configuration ?
From what I read the gr- tunnel interface should be load balanced round robin between FPC with tunnel services , but I don’t see it happening in the lab i.e all the gr- tunnel interface is either established on one FPC or the other
Thanks
Samit Attawar
(Resident Engineer AT&T)